The above products are all retail prices

  • English
Cart

    Your cart is currently empty.

What is the OEM practice of aromatherapy machine?

  What is the OEM practice of aromatherapy machine?

  The OEM (original equipment manufacturing) process of aromatherapy machine mainly includes the following steps to help brands quickly own their own aromatherapy machine products:

  Demand communication and confirmation

  The brand party communicates in depth with the OEM factory to clarify specific requirements such as product positioning, function, fragrance, appearance design, packaging, etc.

  Product design and proofing

  The factory designs the product appearance and internal structure according to the requirements of the brand party, and the R&D team adjusts the formula and process to make samples for the brand party to confirm.

  Sample confirmation and contract signing

  After receiving the sample, the brand party tests and gives feedback, signs the production contract after confirmation, and pays the deposit.

  Raw material procurement and production preparation

  The factory purchases qualified raw materials, prepares the production line, and ensures the quality and safety of the raw materials.

  Mass production and quality inspection

  Mass production is carried out according to the established process, and each batch of products is strictly inspected for quality, including fragrance, concentration, safety, etc.

  Packaging and OEM

  Product packaging and OEM are carried out according to the packaging design plan of the brand to ensure that the product appearance is consistent with the brand image.

  Logistics delivery and after-sales service

  The factory delivers the finished product to the brand and provides necessary after-sales support, such as product usage guidance and quality problem handling.

  The entire OEM process usually supports personalized customization, including fragrance, function, appearance, packaging, etc., which is suitable for companies or individuals who want to quickly build their own brands. Some factories can also achieve fast delivery from demand to shipment in about 20 days

Older Post
Translation missing: en.general.search.loading